PROJECT MANAGEMENT | My Assignment Tutor

EA303KM PROJECT MANAGEMENT – INDIVIDUAL PROJECT (50%) UnitNumberandTitleEA303KM PROJECT MANAGEMENTAcademicYearSPRING 2021 COURSE (MARCH 25 – 29)Course InstructorDr. Annamalai ChockalingamAssignmentTitlePROJECT MANAGEMENT (PM)IssueDate29 MAR 2021SubmissionDate20 MAY 2021AssessmentINDIVIDUAL REPORT – 50%Font, Font SizeDubai / Arial / Times New Roman (12) SubmissionFormat:The submission should be in the form of Individual Submission covering all the given Learning Outcome requirements related to this assignment. The presentation should have clear headings and well-communicated contents. Work must be submitted until the submission date through Moodle if not communicated differently. Submissions must include a cover sheet, declaration sheet, and bibliography via Turnitin.The submission is in the form of report demonstrating understanding and applications in the field of PM. You must submit all the documents with your name, and ID numbers, your Instructor’s name, name of the course ID & name. Further, headings, paragraphs, and subsections should be presented appropriately. Your research should be referenced using the Harvard referencing system. The recommended word limit is 2500 words excluding bibliography however, you will not be penalized for exceeding the total word limit. This report will only be submitted through Moodle Turnitin assignment submission. The penalty for late submission is minus 10% for up to one week late, and minus 20% for up to 2 weeks late. After 2 weeks the submission is rejected.PlagiarismPlagiarism is defined as the presentation of another person’s work as your own. It is a form of cheating. Plagiarism must be avoided at all costs and students who break the rules, however innocently, may be penalised. It is your responsibility to ensure that you understand correct referencing practices. As a university level student, you are exp

💡 Buy the answer for only $12 Get it now →

ected to use appropriate references throughout and keep carefully detailed notes of all your sources for material you have used in your work, including any material downloaded from the Internet. If this be the case, Emirates Aviation University considers plagiarism as theft and any student found to have plagiarised would be awarded an automatic fail for work submitted and may be excluded from further study at the University.Learning Outcomes CoveredLO Course Learning Outcome LO 2 Select and evaluate project management tools and techniques that need to be applied for the effective and successful implementation of a project. LO 4 Schedule and appraise key aspects of industrial or knowledge-based projects within the scope of the indicative content.AssignmentBriefandGuidance:Q1. Assume that you are appointed as Chief Project Manager for one of the leading Airline Operations in UAE/GCC Countries. You are required to prepare a detailed project scope report of 2500 words for constructing a new airport in UAE. The project scope report should cover the following: General Information about your new airport project Project Overview Project Deliverables Work Breakdown Structure Stakeholder Roles and Responsibilities Project Constraints Project Appraisal of New Airport Other recommendations and suggestions Conclusion References (with complete reference list (5-15 references) in the Appendix-Excluded) (35 Marks) Q2. For the following table, select one of the project management tools and do the following: Draw a network path diagram Assess the Early Start, Early Finish, Late Start, Late Finish. (step-by-step procedure) Evaluate the Critical Path (Show all paths and identify the Critical Path).Activity Precedence Duration in Months A – 3 B – 5 C A 6 D A 7 E A 6 F B 4 G B 2 H C 8 I E,F 3 J C 7 K D,H 6 L D,H 5 (15 Marks) Note: Please upload as a single document (.docx or pdf)

💡 Buy the answer for only $12 Get it now →